The set contains three wagons to build a construction/maintenance train of the Czechoslovakian State Railways.
The set consists of a personnel carrier wagon, a construction/maintenance train wagon and a boxcar.
■ Matching addition to the digital railway slewing crane, item 73038
Every vehicle fleet of a railway administration should also have some special wagons as they are indispensable for the maintenance of the rail facilities. Often it is old goods wagons or passenger coaches that have been specially modified and prepared for their new purpose. One group of these special vehicles are the construction train carriages. They can often be found as complete, colourfully arranged trains next to rail construction sites. Although no one pays much attention to these vehicles, they are nevertheless crucial for the smooth operation on the railways. And not least for this reason, these vehicles will create an authentic atmosphere also on your model railway layout.
General data
Coupling
NEM shaft 362 with close coupling mechanism
AC Wheel set Article number
40196
Scale
H0
Epoch
IV-V
Article number
76019
Railway Company
CSD
Electrical
Interior lighting Article number
40420
Interior lighting
Retrofittable
Control
DC Analog
Measurements
Length over buffer
485 mm
top of page
$92.00Price
bottom of page